Taolin Railway Bikeway Final Phase Completed, Transforming Former Linkou Line into 17.5-km Corridor
AEC industry
The Taoyuan City Government has completed Phase 6 of the Taolin Railway Bikeway project after 245 days of construction, finishing the final section of approximately 1 kilometer. The decommissioned TRA Linkou line is now transformed into a 17.5-kilometer green corridor connecting New Taipei's Bali to Yongan Fishing Port.
The transformation of the former Taiwan Railway Administration Linkou line into the Taolin Railway Bikeway has reached completion with Taoyuan City's Phase 6 project. Constructed over 245 days, the final section spans approximately 1 kilometer with bikeways and rest nodes, organized into mountain, coastal, and scenic zones. Originally built in 1968 by Taiwan Power Company and operated by TRA to transport coal to the Linkou Power Plant, the line offered temporary free passenger services in 2005 before being decommissioned in late 2012 due to insufficient ridership and railway elevation plans. Through municipal revitalization, the entire disused corridor has been transformed into a 17.5-kilometer green bikeway and pedestrian pathway connecting with Provincial Highway 61 and Taiwan Cycling Route No. 1, linking northern routes to Bali in New Taipei and southern paths to Yongan Fishing Port.
Key takeaways
- Taoyuan City completed Phase 6 of the Taolin Railway Bikeway over 245 days, constructing approximately 1 kilometer of cycling path and rest nodes.
- The project finalizes the repurposing of the decommissioned TRA Linkou railway into a 17.5-kilometer green bikeway and pedestrian corridor.
- The completed section connects with Provincial Highway 61 and Taiwan Cycling Route No. 1, linking travel north to Bali and south to Yongan Fishing Port.
Source:公視|新聞 Read the original ↗
Prepared, checked and automatically published by AI; not individually reviewed by a human. Translation checked by AI.