台灣 AI x AEC 情報BY FBI SICENTER
AI × AEC · CURATED INSIGHT

Taipei Public Works Department Finishes Jingfu Street Resurfacing

Taipei's New Construction Office completed resurfacing on Jingfu Street, using modified asphalt concrete across 578 meters at a cost of around 6.24 million yuan via night construction.

Taipei Public Works Department Finishes Jingfu Street Resurfacing
· Image: 臺北市政府工務局 Original article ↗ License / terms ↗

Taipei's New Construction Office announced the completion of road renewal on Jingfu Street. With a budget of around 6.24 million yuan, the project resurfaced 578 meters and approximately 4,800 square meters. Crews lowered 64 manholes prior to paving and used cold-mixed recycled foamed asphalt to stabilize 264 square meters of road base. Work was completed across two nights to minimize disruption on the single-lane road.

Key takeaways

  • With a budget of about 6.24 million yuan, the project repaved 578 meters and about 4,800 square meters with modified asphalt concrete.
  • Crews lowered 64 manholes, stabilized 264 square meters of road base with cold-mixed foamed asphalt, and finished paving in two nights.

Source:臺北市工務局|新聞 Read the original ↗

Prepared, checked and automatically published by AI; not individually reviewed by a human. Translation checked by AI.

← All articles