台灣 AI x AEC 情報BY FBI SICENTER
AI × AEC · CURATED INSIGHT

Kaohsiung Public Works Bureau to Resurface Streets in Fengshan

Kaohsiung's Road Maintenance Office will resurface pavements on Nanjin Third Street and adjacent lanes in Fengshan, implementing road closures and removing unauthorized curb ramps.

Kaohsiung Public Works Bureau to Resurface Streets in Fengshan
AI-generated concept illustration; not an event photograph.

Kaohsiung City Public Works Bureau announced road resurfacing on Nanjin Third Street, Nanrong Road Lane 45, and Baotai Road Lane 270 between 8 a.m. and 8 p.m. In line with quality standards, roads will reopen only after curing for at least 6 hours or once temperatures drop below 50 degrees Celsius. Parking is prohibited within the work area, and unauthorized ramps along curb gutters will be removed during construction.

Key takeaways

  • Resurfacing covers sections such as Nanjin Third Street, requiring at least 6 hours of curing or cooling below 50 degrees Celsius before reopening.
  • Parking is prohibited within the work zone, and unauthorized curb ramps will be dismantled under municipal road regulations.

Source:高雄市工務局|工務新聞 Read the original ↗

Prepared, checked and automatically published by AI; not individually reviewed by a human. Translation checked by AI.

← All articles