台灣 AI x AEC 情報BY FBI SICENTER
AI × AEC · CURATED INSIGHT

Kaohsiung Plans Road Resurfacing on Tongming and Nanfu Streets in Fengshan

The Kaohsiung Public Works Bureau announced road resurfacing on Tongming and Nanfu Streets in Fengshan on October 30–31 (ROC 115). Traffic will reopen after curing for over 6 hours or cooling below 50°C, and illegal ramps will be removed.

Kaohsiung Plans Road Resurfacing on Tongming and Nanfu Streets in Fengshan
AI-generated concept illustration; not an event photograph.

The Road Maintenance Office of Kaohsiung Public Works Bureau announced road resurfacing on Tongming Street and Nanfu Street in Fengshan District on October 30–31 (ROC 115) from 8 a.m. to 8 p.m. Work will avoid commuter peak hours, with lane closures and traffic controllers deployed. Reopening requires curing for at least 6 hours or cooling below 50°C. Parking in work zones is prohibited, and unauthorized ramps along curbs will be demolished.

Key takeaways

  • Kaohsiung Road Maintenance Office will resurface Tongming and Nanfu Streets on October 30–31 (ROC 115) from 8 a.m. to 8 p.m., with postponement if weather is poor.
  • Roads will reopen after curing for at least 6 hours or cooling below 50°C; work zone parking is banned and illegal curb ramps will be removed.

Source:高雄市工務局|工務新聞 Read the original ↗

Prepared, checked and automatically published by AI; not individually reviewed by a human. Translation checked by AI.

← All articles